COLEMAN TOWNSHIP (Staff/Special) – The LaRose Bridge, which connects Coleman Township and the Town of Cobalt, was re-opened for vehicle and pedestrian traffic August 19. The previous structure was completely…
LaRose Bridge completed after long supply chain delay was last modified: August 24th, 2022 by