FOOTWORK

Foot by foot, metre by metre, the $324,000 replacement of the New Liskeard boardwalk began last week. A crew from South Wabi Sawmill – clockwise, from upper right, Dave Rideout, Jacob Rideout, Shane Hewitt and Chad Livingston, hidden – is pictured above installing another section. (Staff photo by Diane

This content is for Speaker Online Digital Subscription members only.
Register
Already a member? Log in here

FOOTWORK was last modified: September 24th, 2014 by speakeradmin